Blytheco Home | Sage Software | Sage MAS 90 & 200 | Modules | Bill of Materials

Bill of Materials — Sage MAS 90 & Sage MAS 200

The Bill of Materials module for Sage MAS 90 and Sage
MAS 200 ERP systems allows you to easily create and maintain a detailed bill of the components and miscellaneous charges that make up your finished items and subassembly components. You can produce accurate and informative reports detailing bill structures, component requirements, and production history.

The Bill of Materials module is designed to accommodate the after-the-fact recording of production. As the production of each finished product is recorded, the component items used are automatically relieved from inventory, and the finished products are automatically received into inventory.

Disassembly of finished items can also be recorded. During Disassembly Entry and Production Entry, components may be added, deleted, or modified.
manufacturing module - mas 90
Products sold in a variety of configurations are accommodated by a unique Bill Options feature. Using this feature, components to be added to or subtracted from the base bill may be specified for each option. When the Sales Order module is integrated, you can select Bill Options during Sales Order Entry and Invoice Data Entry.

Engineering Change Control and unlimited revision capabilities are key features of the Bill of Materials module. The Engineering Change Control feature facilitates the recording of bill structure changes, which improves product quality and production efficiency. A detailed record of engineering changes and bill revisions may be retained indefinitely, providing a complete history of the evolution of your products.

 

 

Features

Bill Revisions—Different versions of a bill can be maintained simultaneously. This feature is useful if you change the configuration of your product but still need to refer to the old configurations.
Bill Options—Bills with multiple configurations can be created. Up to nine categories of options can be defined for each bill. Each option category can have an unlimited number of valid choices, with separate cost associated with each one.
Up to 99 Levels—One bill can contain up to 99 levels. You can obtain a comprehensive overview of the entire bill structure from the Indented Bill of Materials Report.
Phantom Bills—Components grouped together for manufacturing purposes but never built for stock can be defined as phantom bills. You can print reports with phantom bills, or you can blow through phantom bills by printing only their components.
Sales Kit Processing—Sales kits are single-level assemblies not normally stocked together but grouped as a unit when a sale is made. Kit components can be added or deleted during Sales Order Entry. At your preference, component detail can be printed on sales orders and picking sheets.
Yield and Scrap Accommodation—Built-in yield and scrap accommodation provides accurate forecasting of material requirements, as well as final output. Both yield and scrap calculations can be used within a single bill.
Production Entry—Manufactured products can be recorded into inventory and component materials relieved using this program. During the entry process, bills are automatically exploded into component detail lines. You can add, delete, or change component items and override standard quantities and warehouse for each component. Miscellaneous Charges and comments can also be entered.
Disassembly Entry—Disassembly of manufactured products can be recorded into inventory and component materials returned to stock using this program.
Engineering Change Control—Planned changes to the bill structure can be recorded in advance. You can add or delete multiple components from a bill using the engineering change process. You can also specify an effective date when printing reports to include engineering changes up to that date.
Miscellaneous Charges—Bills can include non-material charges such as labor and overhead costs. Actual units and costs associated with Miscellaneous Charges can be entered during Production Entry to reflect actual costs incurred.
Cost Roll-Up Register—The cost of each bill can be calculated based upon the cost of each component and Miscellaneous Charge, and upon any yield and scrap percentages. The component costs can be calculated using the average, last, or standard cost method.
Work Order Integration—When integrated with the Work Order module, bill of material components can be automatically merged into a work order. The Work Order module provides a complete Work in Process Manufacturing System for companies that require more comprehensive control of their manufacturing process.
MRP Module Integration—The Bill of Materials module provides bill detail that is used by the Material Requirements Planning (MRP) module. The MRP module provides information to the purchasing and production departments so that they can maintain sufficient amounts of materials on hand at all times.
Bar Code Printing—Production labels and picking sheets can be customized to print two types of bar codes to speed workflow through your plant. Bar codes and bar code printers must be predefined using the Bar Code Printer Maintenance in the Inventory Management module.
 

Reports:

Picking Sheet
Production Entry Register
Production Labels
Disassembly Entry Register
Cost Roll-Up Register
Daily Transaction Register
Single-Level Bill of Materials Report
Indented Bill of Materials Report
Summarized Bill of Materials Report
Single-Level Where-Used Report
Indented Where-Used Report
Summarized Where-Used Report
Component Requirement Report
Gross Requirements Report
Costed Bill of Materials Report
Bill Validation Report
Production History Report
Engineering Change History Report
General Ledger Posting Recap
Engineering Change Register
Replace/Delete Component Register    
 
Bill of Materials Module - printable download of this page (PDF 203 kb)
 
Questions? Please call us at (949) 583-9500 x130 or email us at
Modules Overview List
 

1.800.425.9843   •      •   Contact Us
Sage MAS 90Sage MAS 200Sage MAS 500Sage Abra HRMSSage Saleslogix CRMSage Fundraising 50Sage MIP Fund Accounting
SageCRMSage BusinessWorksSage FAS Fixed AssetsSage Software TrainingNetwork Security
Sage Service AreasAtlanta, GAOrange County, CATampa, FLLos Angeles, CANational Locations
West Coast Region: 23161 Mill Creek Dr., Laguna Hills, CA 92653  •  East Coast Region: 1100 Johnson Ferry Rd., Suite 450, Atlanta, Georgia 30342
Contact UsSitemapAccounting LinksCompliance and Legal Notice•  Copyright ©2008 Blytheco, LLC